It is anticipated that the T-2 (Phase-1) building will boost the airport’s annual passenger capacity from 23 million to 35 million.
Prime Minister Narendra Modi will open the state-of-the-art integrated terminal building at the Chennai airport in Tamil Nadu this evening as part of a two-day tour of south India.
Here is a quick guide of this important story in 5 points:
- The new terminal’s initial phase, which cost $2,437 crore to build, is now complete. “Cambridge’s infrastructure will benefit greatly from this addition. In addition to improving connection, it would also help the local economy, according to PM Modi in a tweet.
- It is anticipated that the T-2 (Phase-1) building will boost the airport’s annual passenger capacity from 23 million to 35 million.
- The new integrated terminal, which spans 2.20 lakh square meters, will accommodate Tamil Nadu’s expanding flight traffic, according to officials at the Chennai airport.
- There are 108 immigration desks at the terminal, distributed equally between the arrival and departure zones. According to officials, it would speed up the transit procedure and considerably improve the travel experience for travellers.
- Along with sarees, temples, and other aspects that emphasise the surroundings’ natural beauty, the architecture of the new terminal also integrates traditional elements like Kolam, a type of rangoli or beautiful art seen at the entryway of south Indian households.