Periodic maintenance of tracks, signals & Over Head Equipment (OHE) is crucial to ensure the safe & efficient operation of railway system. Regular and systematic maintenance of this component helps prevent disruption and delays, ensuring trains run on schedule and extend the lifespan of railway infrastructure, contributing to the overall safety
Reliability of train operation. Keeping in the mind the need for maintenance, integrated mega traffic & power block has been planned in Howrah-Barddhaman Chord, Howrah-Bandel-Naihati, Barddhaman-Howrah & Khana-Gumani section over Howrah Division on 10.12.2023 (Sunday). Consequently, the train regulations will be as follows:
Cancellation (On 10.12.2023):
From Howrah: 37315, 37825
From Barddhaman: 36840
From Tarakeswar: 37326
Controlling on 10.12.2023:
13015 Howrah – Jamalpur Kaviguru Express, 31151 Sealdah – Barddhaman local, 12338 Bolpur – Howrah Shantiniketan Express will be suitably controlled enroute for 45 minutes, 15 minutes, 15 minutes respectively on 10.12.2023.
Moreover, 37328 Tarakeswar – Howrah local will be rescheduled by 30 minutes.
Inconvenience to be caused to the passengers is deeply regretted.